Video and still images on this page are the property of Greens on Screen, unless otherwise stated. Feel free to take copies of GoS-owned material for personal use, but please do not publish or distribute without permission. 

There may be a delay before this page fully loads. If you find that some images fail to appear (a red cross in the top corner),  use the refresh button to correct.

Onwards and Upwards

20 Oct 2001

Click on each thumbnail for the full image, use your back button to return

Grateful thanks again to Andy Laidlaw and Ian Newell for their contributions. The work goes on, and although there may not seem to be huge difference in the last few days, a lot has happened. The concrete base has at the Devonport End has set and the base at the Barn Park End has now been laid. Steel and translucent panels are now going up at the rear of each end, as is the concourse roof at the Devonport End. Meanwhile, the pre-formed concrete along the Lyndhurst has nearly 'joined up'.  

 

Thanks to the Club for giving access to Home Park, and Barr for their cooperation